Profile summary:
Cross-Country Pipeline, Building Construction.Trimming, dressing, leveling, refilling of trenches cutting Construction of circular type manhole.Providing fix close timbering in trenches for the depth up to 3M below G.L.Preparation and submission of detailed exploration survey report of the area.Alignment and gradient, making the joint with rubber gasket including excavation.Excavation and refilling of trenches from G.L. to invert level of pipes.Checking of Manhole depth, width, Dia & brickwork as per specification.Preparing plain cement concrete with 12mm size hard granite chips, coarse sand, and cement in the proportion of 4:2:1 (M-15) concrete cradle bedding & as per specification. Preparing different type of Manholes- A (1.65m deep with side slopes up to 560mm internal dia) B (2.30 deep with side slopes up to 560mm internal dia), C (4.95 deep with side slopes up to 560mm internal dia).
Work Experience :
Senior Project Engineer
Not Available - Presently working