Profile summary:
Elec. Execution and Site Coordination. Taking care of site execution of electrical, mechanical & plumbing services. Able to execute the work as per approved drawings/plan. Preparing RA Bills for all activities and submitting & approving as same. Also follow ups for check payment. Monitoring the installation of Electrical activities such as Slab conduit, Block wall, Dry wall, RCC wall GI concealed box fixing, Wiring, DB dressing, switch sockets, light Fixtures, Cable tray, Trunking, Earthling strip, Cabling, Aviation light, lighting arrestor, Bus duct Riser, Tap off Box, Isolators, LT panels, Energy meters and poles.Also monitoring the Installation of mechanical and plumbing, HVAC, Fire Alarm and PA system activities such as Riser, branch line, sprinkler, hydrant, hose pipe, jokey pump, fire pump, booster pump, centrifugal pump, soil line, waste line, water supply and final fixture, damper, ducting, axial fan and cabinet fan, fire panel, Fire alarm control panel, SD,HD, hooter, MSFD.
Work Experience :
Project Engineer
Not Available - Presently working