Profile summary:
Survey Instruments: Auto level, Theodolite, Compass, Total Station, GPS
Auto CAD, Civil 3D,
Basics computer operation, MS Word, MS Excel
Platforms: Windows.
Work Experience :
Surveyor
2015-07-13 - 2017-01-02
i) Responsible for the survey of Box-culvert.
ii) Also responsible for Catch Pit, Duct, Electric Pole foundation.
iii) Done Wadi Bridge survey
vi) Done Inter Change and Over Pass MSE wall survey
Surveyor
2017-06-19 - 2018-04-26
i) Responsible for the survey of Column.
ii) Also responsible for all foundation leveling.
iii) Preparing report as per the Consultant requirement
iv) Taken OGL and also done TBM carry and control pillar shifting by Traversing .
Surveyor
2018-05-01 - 2020-02-11
Topography Survey by using Total station, GPS.
Open & Closed Traversing and error minimize Site TBM.
All Type of setting out for Road and Building works (All levels and coordinates, Road Alignment, Asphalt, Karb stone, Gully pot, Manhole Etc.).
Prepare X-Section for road.
Preparing Coordinates and Documents for As-Built.
Prepare for As-Built Drawing.
All Survey data analysis and making report.
Survey Engineer
2020-02-13 - 2024-07-26
Topography Survey by using Total station, GPS.
Open & Closed Traversing and error minimize Site TBM.
All Type of setting out for Road and Building works (All levels and coordinates, Road Alignment, Asphalt, Karb stone, Gully pot, Manhole Etc.).
Prepare X-Section for road.
Preparing Coordinates and Documents for As-Built.
Prepare for As-Built Drawing.
All Survey data analysis and making report.