Job seeker profile

Mr. GORLA UMAPATHI


SITE ENGINEER
6.6


Personal information:


Name : Mr. GORLA UMAPATHI
Birth Date : 1995-06-13
Country : India
Position: SITE ENGINEER

Work Area :


Skill:
  • Tunnel excavation in all kind of geological conditions in NATM method. • Concrete lining for tunnels
  • TR
  • CP
  • RCW
  • RC to maintained Indian railway standards Quality controlling tunnel lining and shotcrete with reference to RDSO and ISO standards
  • Industry: Construction/Engineering/Cement/Metals
    Functional area: Highway / Structure
    Designation : SITE ENGINEER
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 5.00 Lacs

    Profile summary:


    Dedicated & diligent Civil Engineer holding a progressive career of nearly 6.5 Years in Civil Engineering Works. • Core competencies in managing all essential aspects- Scope of work, Technical Specification, Drawings, and Quantity Working out, Material Requirement for Project for Giving a Smooth flow to all activities. • Efficient and invaluable experience in Site Execution, Earth works, RDSO Bar bending schedule, Preparation and checking of Client Bills and drawings, Bar bending Schedule, Subcontractor Bills, managed on site record keeping, maintained paper works requirements for each job and ensured cleanliness up of job site.

    Education details :


    Ph.D
    Specialization : CIVIL Engineering (pursuing)
    Institute name: Mohan Babu University
    Marks / Percentage : b
    Passing year: 2020

    Work Experience :


    SITE ENGINEER
    2020-02-18 - Presently working
    Company name : CHINA STATE CONSTRUCTION ENGINEERING CORPORATION Pvt Ltd
      Annual salary : 8.00 Lacs
    Industry : Construction/Engineering/Cement/Metals
    Functional area : Highway / Structure

    Working out quantities for Civil (Brick work, plastering, painting, interior fit-out-etc. and Structural) • Site execution as per architect design specification with contractor. • Site Coordination with Architect, Maintaining the safety measures in sites. • Checking materials and work in progress for compliance with the specified requirements. • Ensure the site work as per approved drawing and specification. • Prepare work schedule for achieving milestones. • Manpower Deployment as per site conditions. • Quality control in accordance with reference to IS codes and procedures. quality plans and inspection and test plans, all prepared by the project management team and by subcontractors. • May 2018 TO January 2020 Tunnel construction Engineer (NATM method) New Broad gauge Railway line from Obluvaripalli to Venkatachalam which includes two tunnels