Sr. Highway Engineer
2019-09-17 - Presently working
Embankment, Sub grade, G.S.B,WMM,DBM,BC,DLC, PQC, Kerb laying, all work of toll plaza
(chambers, canopy, toll booth barrier , bull nose, building works)
(b) Update daily and monthly progress report & closing update R.F.I. with measurement.
(c) Planning of day to day work to Optimum Utilization Man Power .Preparation Of Sub Contractor
Bill.
(d) Working As site Engineer Responsible All Site Work Quality Control Work, Erection Work,
Safety Work, Machinery Mobilization
Structure Work
(a) Construction Of under Pass , Fly Over, Minor Bridge, Box Culvert, Slab Culvert, Pile Foundation,
Pile Cap , Abutment , Pier Cap, Pedestal , Bearing , Dirt wall, Retaining Wall, Expansion Joint,
Reinforce Earth Wall. Approach Slab, Friction Slab R.C.C Crash Barrier Railing
(b) Construction of Drain (P.C.C, R.C.C & Brick) Pipe Culvert, Metal Crash Barrier, Chutes. Tiles, Brick.
on Edge.
(c) Preparation Of Bar – Bending Schedules for Over –Pass, Fly Over, Minor Bridge, Box
Culvert, Slab Culvert, Drain