Job seeker profile

Mr. Rahul Sen


SITE INCHARGE
9.9


Personal information:


Name : Mr. Rahul Sen
Birth Date : 1991-03-06
Country : India
Position: SITE INCHARGE

Work Area :


Skill:
  • Construction  of  Flexible pavement &  Rigid pavement
  • GSB
  • DLC
  • PQC
  • DBM
  • BM
  • SDBC and BC  & SMA
  • Morth
  • IRC
  • IS of Contract
  • Project Management
  • Good Execution skill
  • Team Handling
  • Good Communication
  • Problem Solving
  • Good Numerical Skill
  • Industry: Construction/Engineering/Cement/Metals
    Functional area: Highway / Structure
    Designation : SITE INCHARGE
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 8.80 Lacs

    Profile summary:


    I Have 8 year’s professional experience as a Highway, Structure & Building Engineer in Infrastructure work. Good communication skill with staff and consultants..

    Education details :


    B.Tech/B.E.
    Specialization : Civil Engineering
    Institute name: RGPV University
    Marks / Percentage : B
    Passing year: 2015

    Work Experience :


    SITE INCHARGE
    2019-08-09 - Presently working
    Company name : MKC infrastructure LTD
      Annual salary : 7.50 Lacs
    Industry : Construction/Engineering/Cement/Metals
    Functional area : Highway / Structure

    ⮚ Timely work progress with set targets and get bills ⮚ Quantity evaluation of all material required in construction of structure e.g. Cement aggregate ,steel etc. ⮚ Original Ground Level (O.G.L.) ⮚ Structure Work Major Bridge, Minor Bridge, VOP, Underpasses,Box Culvert, Hume Pipe Culvert, Drain Work etc. ⮚ Building Work Like Way side amenities of Expressway, Food court, Restaurant, Travel Desk, Motel, Tromma Center, Petrol Pump, ⮚ Footing, Plinth Beam, Plinth Slab, Column, Beam, Lintel, Slab, ⮚ Layout, Levelling, Bar Bending Schedule, Scaffolding ⮚ Fixing TBM & Shifting with Auto level. ⮚ Embankment, Sub grad, G.S.B, WMM Leveling. ⮚ D.L.C., P.Q.C Top Preparation. ⮚ Laying for Up to Wet Mix Macadam(WMM). ⮚ RFI Maintain & Quantity checking ⮚ Checking of levels and gradients and execution of original ground levels OGL Recorded Embankment, subgrade. GSB, WMM, BM, DBM, BC & SMA etc. ⮚ I am inertly involve survey work preparing Level sheet Emb. Top, sub grade, G.S.B., W.M.M,B.M, D.B.M., B.C.,SMA ,P.Q.C., D.L.C. Level.