SITE INCHARGE
2019-08-09 - Presently working
⮚ Timely work progress with set targets and get bills
⮚ Quantity evaluation of all material required in construction of structure e.g. Cement aggregate ,steel etc.
⮚ Original Ground Level (O.G.L.)
⮚ Structure Work Major Bridge, Minor Bridge, VOP, Underpasses,Box Culvert, Hume Pipe Culvert, Drain Work etc.
⮚ Building Work Like Way side amenities of Expressway, Food court, Restaurant, Travel Desk, Motel, Tromma Center,
Petrol Pump,
⮚ Footing, Plinth Beam, Plinth Slab, Column, Beam, Lintel, Slab,
⮚ Layout, Levelling, Bar Bending Schedule, Scaffolding
⮚ Fixing TBM & Shifting with Auto level.
⮚ Embankment, Sub grad, G.S.B, WMM Leveling.
⮚ D.L.C., P.Q.C Top Preparation.
⮚ Laying for Up to Wet Mix Macadam(WMM).
⮚ RFI Maintain & Quantity checking
⮚ Checking of levels and gradients and execution of original ground levels OGL Recorded Embankment, subgrade. GSB, WMM, BM, DBM, BC & SMA etc.
⮚ I am inertly involve survey work preparing Level sheet Emb. Top, sub grade, G.S.B., W.M.M,B.M,
D.B.M., B.C.,SMA ,P.Q.C., D.L.C. Level.