Profile summary:
In my over 9 years of relevant experience in Assistant Manager EPC mode Highway Project, I have been
extensively engaged in Flexible Pavement, quantity with advance earth moving equipment, design, drawing, technical
specifications and geometrical design of highway ..
Work Experience :
Highway Engineer
2023-01-23 - Presently working
Clearing & Grubbing
LevelChecking.
Construction ofEMBANKMENT & SUBGRADE.
Construction ofGSB,WMM,DBM,BC.
Different tests used in execution on the site.
Records ofthe machineryworking on the site as per their output.
Good coordination with a working staff.
Optimum use ofavailable machineryand manpower as per situation.