Job seeker profile

Mr. SUBHAKER YADAV


Sr. Tunnel Engineer
7.7


Personal information:


Name : Mr. SUBHAKER YADAV
Birth Date : 1996-07-04
Country : India
Position: Sr. Tunnel Engineer

Work Area :


Skill:
  • Tunnel Excavation
  • Drilling And Blasting Work
  • Grouting
  • Pipe Roofing
  • NATM
  • NATM excavation techniques
  • Tunnel engineering Supervise NATM excavation parameters
  • NATM design
  • Good Problem Solving Skill
  • Good Communication
  • Industry: Tunnel Construction Project
    Functional area: Tunnel Construction
    Designation : Sr. Tunnel Engineer
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 5.00 Lacs

    Profile summary:


    With my continuous learning, i want to reach the height of success. To attain the highest position in the corporate world by working hard and applying my desires..

    Education details :


    B.Tech/B.E.
    Specialization : Civil Engineering
    Institute name: Dr. A. P. J. Abdul Kalam Technical University
    Marks / Percentage : 65.5%
    Passing year: 2017

    Work Experience :


    Sr. Tunnel Engineer
    2021-12-22 - Presently working
    Company name : Larsen and Toubro
      Annual salary : 4.50 Lacs
    Industry : Tunnel Construction Project
    Functional area : Tunnel Construction

    Responsible for TBM Segment Erection & Grouting.  Ensure Project Excavation Six stage sequence is carried out accordance with approved ensuring adherence to Project schedule and also involve in all Execution activities.  Execution of different type of support systems Like:- cavity treatment, Piperoof, Fore poling, Rock bolt, PFRS Shotcrete, Grouting, lattice girder, Rib, Probe hole, & wire mesh to the face of stability.  Working out different drilling & blasting patterns to split the rocks so to get maximum pull.  Inspection of Rock Bolt installation & its testing (Pull out test).  Execution as per consultant drawings & specification.  Worked very closely to improve the cycle time during excavation period.  Blast Monitoring to minimize the over break and optimize the Blast with less specific Charge and Powder Factor.  Segment Casting yard developing. a. BBS. b. Raft foundation. c. Column and beam. d. Rigid pavement with dowels bar.  Experienced in this project 11km TBM Tunneling & 3km NATM Tunnelin