Job seeker profile

Mr. SUMIT PAINULY


Manager - Tunnel
10.10


Personal information:


Name : Mr. SUMIT PAINULY
Birth Date : 1993-07-23
Country : India
Position: Manager - Tunnel

Work Area :


Skill:
  • Tunnel Excavation
  • Drilling And Blasting Work
  • Grouting
  • Pipe Roofing
  • NATM
  • NATM excavation techniques
  • Tunnel engineering Supervise NATM excavation parameters
  • NATM design
  • Good Problem Solving Skill
  • Good Communication
  • Industry: Tunnel Construction Project
    Functional area: Tunnel Construction
    Designation : Manager - Tunnel
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 9.10 Lacs

    Profile summary:


    Offer my services to explore my abilities to the best of my knowledge and experience in the pioneering environment, where I can contribute in the development of the organization as well as I can upgrade my career path with a good exposure and seeking assignments in Geological and Geo-Technical Assessments, Construction Project Operations, Site Management, Mapping geologist Quality control and Maintenance with a reputed organization. Geological Maps (2D & 3D), Geological and Geotechnical information of the tunnels, As Built drawing. Slope stabilization, Portal development of tunnels, Tunnel Excavation in multi drifting method. Location Preference: Anywhere in India and Abroad..

    Education details :


    MS/M.Sc(Science)
    Specialization : Science
    Institute name: HNB Garhwal
    Marks / Percentage : 73.37%
    Passing year: 2014

    Work Experience :


    Manager - Tunnel
    2022-12-11 - Presently working
    Company name : Dilip Buildcon Ltd
      Annual salary : 8.00 Lacs
    Industry : Tunnel Construction Project
    Functional area : Tunnel Construction

    Responsible for taking the decisions for finalizing the support elements as per Technical Specifications or as per the site feasibility for the Portal developments prior to the Tunnel Excavation and ensuring the proper ground improvements, execution and support measures as per Approved Method Statement (MS).  Responsible for preparing and finalizing the Geological Face Mapping sheets and provides the Rock Mass Classification – RMR, GSI and then finalizing the Primary Support System such as Pipe Roofing, Fore Poling, LG / Rib Erection, Rock Bolting, Wire Mesh, Shotcrete, Pre Injection Grouting and other Ground Improvement Measures etc. for the Tunnels or Excavated Surface in NATM.  Responsible for taking the MWD data from drill jambo and analysis data of face drilling and probe hole in isure software.  Handle all the technical issue and interaction with PMC RE Geology.  Maintain all the technical and Geological record.  Preparation of Blasting Pattern/ Blasting Pattern and PPV Monitoring (Vibration Monitoring).  Monitoring of overbreak during tunnel excavation and providing precautionary measures to control it  Tunneling in Multi Drifting Methods (Multi-stage excavation).  Rock mass classification as per NATM / ONORM specification in relation to ground type and behavior type