Name : | Mr. PUSHPENDAR KUMAR RANA |
Birth Date : | 1994-10-04 |
Country : | India |
Position: | Highway Engineer |
Skill: |
|
Industry: | Construction/Engineering/Cement/Metals |
Functional area: | Highway / Structure |
Designation : | Highway Engineer |
Desire job type : | Permanent |
Employment type : | Full Time |
Preferred shift : | Day |
Expected salary: | 13.50 Lacs |
To associate with an organization, which progresses dynamically And gives me a chance to update my skills in the state of art Technologies and to be part of a team that excels in work towards the growth of the Organization..
Specialization : | Civil Engineering |
Institute name: | MATHURA UP .281205 |
Marks / Percentage : | B |
Passing year: | 2013 |
Company name : | NKGC (Sub contractor of Rajshyama Cons. Pvt.Ltd. |
Annual salary : | 11.00 Lacs |
Industry : | Construction/Engineering/Cement/Metals |
Functional area : | Highway / Structure |
1. Setting out the works in accordance with the drawings and specification. 2. Liaising with project panning engineer regarding construction programs. 3. Checking material and work in progress for compliance with the specified requirements. 4. Ensure that all the work meets the stipulated quality and workmanship. 5. Preparing record drawings, technical reports, and site dairy. 6. Coordinate with subcontractors and client for smooth flow of work. 7. Conversant with various tests to be conducted on road and bridge construction materials, Procedures of testing and the frequency. 8. Conducting various test over available source of material. Material testing on completed elements of works. Acceptance tests keeping in view of the specification and standards. 9. Familiar with IS, IRC standards,BIS & MORTH specification and all related codes of practice involved in various stages of construction of roads and bridges. 10. Familiar in testing of soils for embankment & sub grade, Job mix formulae of Granular Sub Base (GSB), Wet Mix Macadam (WMM),Pavement Quality Concrete (PQC), Dry Lean Concrete (DLC) and Cement Concrete of various grades. 11. Maintain the Strip chart, Monthly progress report, Daily progress report. 12. Bituminous Testing, Bitumen Testing, WMM Testing, GSB Testing , Cube Testing, Soil Testing, Sand Testing, and Concrete Testing, etc. 13. Identification of borrow areas and materials sources