Profile summary:
Able to work independently or in a team producing results in a time frame, methodical and innovative, very adaptable, communicative, quick learner, dedicated, sincere, logical, careful and positive..
Work Experience :
DPM-Highway
2022-01-09 - Presently working
Making of Embankment sub grade GSB with proper utilization of machineries
Laying of WMM, DBM, BC and DLC with sensor pavers.
Laying of pavement quality concrete (PQC) with sensor pavers.
Execution of work according to proper programming and planning
Site planning & controlling for manpower, machinery and materials
Execution and monitoring of all Roads Furniture works as per IRC
Maintaining proper quality and safety
Controlling contractor bills.
Coordinate on project time scheme during project implementation.
Supervise and monitor construction installation re-progress and quality.
Update and evaluate accomplishment submitted by sub-contractors.
Perform detailed engineering and estimate for civil works as defined in the scope of works
stated in contracts documents.
Analyze plans, contracts documents and specifications
Update and evaluate accomplishment against approval plan.
Prepare materials take-off and estimate per item of works.
Prepare progress billing for architectural and civil works.
Proper coordination with project operation as for as the revision, extra works, delays and
construction problem is concerned.
Prepares billing periodically which corresponds to the accomplishment submitted by the field engineers likewise check sub-cont. billings.
Check and evaluate if there is a revision in plans for take-off purposes.
Preparation of project budgets, monitoring the cost, to highlights and discuss with project
manager and contract team in the event of any over run of budget provisions.
To study contract documents and drawings in detail highlight discrepancies in the drawings/contract documents and bring the same to the notice of the project manager.
Based on construction drawings to work out the anticipated quantities of items required to
complete the allocated project. Assist the project manager in the preparation of phase’s
wise resource requirement and reconciling of material consumption projecting revised estimates.
Co-ordination with contractor group and consultant group
Handling site local problems with site staff and machineries.