Profile summary:
1)Elevated storage Reservoi- Isolated raft,round columns,tie beams,ring beams,bottom dome,conical wall,vertical wall,top dome,staircase,boundary wall,operator room.
pipe line- RWRM CI-600mm,CWRM DI-450/400/350/300/250/200/100mm pipe with pushing jointing. HDPE & DI Distributions- 160/140/125/110/90mm with fusion jointing(200*c), laying works & Hydro test for 1.5 h. pressure holding within 2km.
Intermediate Busting Pumping Station(IBPS)- Boundary wall,Sump House,ECR Switch Yard etc.
2) Building layout plan with centre line method,bar bending schedule (column,plinth beam,lintel,roof slab,staircase),shuttering work,rcc work,finishing work,measurement for billing.
3) Road survey(using auto level), earth work,grannular sub base,BM & SDBC work,concrete work for road..
Work Experience :
Construction / Site Supervisor
2020-05-21 - Presently working