Profile summary:
Assistant Manager Tunnel (NATM) with the method of drilling, Blasting, Mucking, Shotcreeting. Providing support systems like pipe roofing, rock bolts , forepoling, Drainage Holes,Ribs & Lattice Girde erection.
According to rock class and according to Geological studies.
2. Preparation of Actual tunnel support system ATTS.
3. Blast Monitoring to minimize the overbreak and optimize the blast with less Specific Charge and Powder Factor
4. Maintain a record of execution work as per drawing.
5. Micro Planning & scheduling of job, material, manpower, machinery.
6. Coordination with various contracto for the completion of works
7. To ensure the invert lowering, invert support such as invert shotcrete invert lattice girder as per class of rock, smoothening shotcrete after cutting of rock bolts and removal of plates, kicker alignment and casting after laying of side by side pvc perforated pipe and geotextile & water proofing membrane, then final to linning after alignment of gantry, etc.
Work Experience :
Implementation Manager
2019-12-02 - Presently working