Profile summary:
Railway grade seperator project(WCR)
1.Excution of Pile foundation on site Through hydraulic rig as per requirement of the technical specification & Drawing.
2.Excution Of Pile load Test(Initial Load Test, Routine & Lateral Load Test).
2 Excution Of pile cap With Proper Arrangement. AS per Drawing.
3 Excution of Pier shaft as per technical specification & Drawing.
4.Excution of Pier cap as per Technical Specification & drawing.
4.Composite steel girder Erection for 24.4m &18.3m span(Axle Load 25T) as per RDSO Drawing.
5.Installation of Elastomeric Bearing & Guide Bearing.
DFCCIL Project.
1. Excution of Pile foundation Through TMR machine As per Indian standard Codes. &Drawing.
2.Excution Of Pie load Test( Initial Load test, routine load test, lateral load test) As per Indian standard Codes.
3.Excution Of Substructure (Pile cap, Pier, Pier cap).
4 Excution of Supetructure( Psc Girder, Psc Girder stressing, Grouting, Psc Girder Launching).Elastomeric Bearing installation..
Work Experience :
Civil Engineer
2020-03-27 - Presently working