Job seeker profile

Mr. Rakesh Kumar


DPM-Tunnel
10.10


Personal information:


Name : Mr. Rakesh Kumar
Birth Date : 1988-01-21
Country : India
Position: DPM-Tunnel

Work Area :


Skill:
  • Tunnel Excavation
  • Drilling And Blasting Work
  • Grouting
  • Pipe Roofing
  • NATM
  • NATM excavation techniques
  • Tunnel engineering Supervise NATM excavation parameters
  • NATM design
  • Good Problem Solving Skill
  • Good Communication
  • Industry: Tunnel Construction Project
    Functional area: Tunnel Construction
    Designation : DPM-Tunnel
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 8.80 Lacs

    Profile summary:


    Graduate Civil Engineer having 9 years experience in the field of underground and structural works. Well conversed with relevant Indian Standards & have done extensive work on concrete, NATM & NMT method of Tunneling, site execution and supervision. Having good hand on quantity estimation, billing works as planned & as executed according to approved drawings. Currently working with M/S Intercontinental consultants and technocrats Pvt. Ltd. as Deputy Manager/Tunnel Engineer for Construction of Tunnels, Bridges and formation works from chainage 18+444 to 33+097 under Package-2 in connection with New Single Line Broad Gauge Link Between Rishikesh and Karanprayag (125km) in the state of Uttarakhand, India. This is a challenging railway project in Himalayan Region..

    Education details :


    B.Tech/B.E.
    Specialization : Civil Engineering
    Institute name: Kurukshetra University
    Marks / Percentage : 67%
    Passing year: 2014

    Work Experience :


    DPM-Tunnel
    2020-03-04 - Presently working
    Company name : M/s Intercontinental consultants and technocrats Pvt. Ltd
      Annual salary : 8.00 Lacs
    Industry : Tunnel Construction Project
    Functional area : Tunnel Construction

    Responsible for supervision of Tunnel excavation with NATM method with Active involvement in construction activities of earthwork, portal development, slope stabilization, drilling and blasting, rock bolting, shotcrete, wire-mesh along slopes and in tunnels, drainage hole, Rib & Lattice girder erection, pipe roofing, cement (OPC, MFC & UFC) grouting and Pu grouting for consolidation & seepage control.  Verifying the Checklist, measurement sheets, RFIs of executed work as per approved design drawing & method statement.  Preparation of Time Delay report caused due to natural or breakdown reasons.  Preparation of Time cycle report and making a comparison chart of actual and scheduled time record.