Job seeker profile

Mr. SAMRAT DUTTA


Sr. Tunnel Engineer
11.11


Personal information:


Name : Mr. SAMRAT DUTTA
Birth Date : 1990-08-07
Country : India
Position: Sr. Tunnel Engineer

Work Area :


Skill:
  • Tunnel Excavation
  • Drilling And Blasting Work
  • Grouting
  • Pipe Roofing
  • NATM
  • NATM excavation techniques
  • Tunnel engineering Supervise NATM excavation parameters
  • NATM design
  • Good Problem Solving Skill
  • Good Communication
  • Industry: Tunnel Construction Project
    Functional area: Tunnel Construction
    Designation : Sr. Tunnel Engineer
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 8.80 Lacs

    Profile summary:


    • Seeking a position as a Sr. Tunnel Civil Engineer. • Total Work experience – 9 years 10 months.  TBM Tunnel – 8 years running.  Water Treatment Plant – 1year 4 months.  Thermal Power Plant – 6 months. • Worked in TBM Tunnel, NATM Tunnel. • Work experience in Segment Casting Yard, Drilling and Blasting in NATM Tunnel. • Expertise in Tunnel grouting, TBM execution, Man locks chamber disc cutter checking and inspection..

    Education details :


    B.Tech/B.E.
    Specialization : Civil Engineering
    Institute name: HALDIA INSTITUTE OF TECHNOLOGY
    Marks / Percentage : B
    Passing year: 2013

    Work Experience :


    Sr. Tunnel Engineer
    2022-10-18 - Presently working
    Company name : AFCONS INFRASTRUCTURE LIMITED
      Annual salary : 8.00 Lacs
    Industry : Tunnel Construction Project
    Functional area : Tunnel Construction

    • Key Selection of tunnel permanent lining, Grouting with sodium silicate, TBM drive with maintaining all parameters, Minimize the Segment Step-lip checking during segment erection etc. • Cross Passage Drilling and Permeation grouting by AIR ROC Drilling machine, Tunnel excavation, primary shot concreting then wire mesh fixing, Lattice girder or steel rib erection then final shot concreting. • Water Proofing work by SIKA PVC water proofing membrane before permanent Cross Passage lining. • Documentation of soil strata, geological classification, soil strength check by penetrometer, shotcrete strength test and also Ring building, Grouting, Segment ID and ring step - lip & damage report etc. • On ground work like foundation of 35T gantry for mucking, 135 Ton gantry for TBM lowering and receiving, 15-Ton gantry for segment lowering & other misc. materials lowering etc.