Job seeker profile

Mr. SANJAY SHARMA


Civil Engineer
8.8


Personal information:


Name : Mr. SANJAY SHARMA
Birth Date : 1992-11-11
Country : India
Position: Civil Engineer

Work Area :


Skill:
  • Tunnel Excavation
  • Drilling And Blasting Work
  • Grouting
  • Pipe Roofing
  • NATM
  • NATM excavation techniques
  • Tunnel engineering Supervise NATM excavation parameters
  • NATM design
  • Good Problem Solving Skill
  • Good Communication
  • Industry: Tunnel Construction Project
    Functional area: Tunnel Construction
    Designation : Civil Engineer
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 6.60 Lacs

    Profile summary:


    I am a dynamic, result oriented and self-driven person with Total 7 + years of composite experience in Instrumentation & Control (SCADA) /IT in Tunnels & Construction, Intelligent Transportation System (ITS)(ATMS) and CSR. Having worked in one of the most challenging tunnel project(Chenani Nashri Tunnel) in India from the SCADAcommencement, I have a proven track record in complex project management and problem solving activities. Within the Construction, Operation & Maintenance Industry, I have/had experience with Instrumentation and Control (Automation systems) & MEP Coordination. My roles have included the technical and the management of Supervision, Operation and Maintenance side of engineering. I take direction well though I carry out my own research to ensure that I had put forward is the most correct and cost effective solution at the same time considering the “operation and functionality” aspects..

    Education details :


    PG Diploma
    Specialization : Civil Engineering
    Institute name: PGDBM
    Marks / Percentage : B
    Passing year: 2022

    Work Experience :


    Civil Engineer
    2021-09-14 - Presently working
    Company name : QUALIX INFORMATION SYSTEMS LLP
      Annual salary : 7.00 Lacs
    Industry : Tunnel Construction Project
    Functional area : Tunnel Construction

    Testing and Monitoring of Emergency Call System which includes SOS Boxes inside the Tunnel  Managing Operation and Maintenance of 6. Nos of Banana Jet fans which is installed inside the tunnel to control the longitudinal air flow.  Managing Operation and Maintenance of electrical equipment’s related to such as Diesel Generators,Power interface unit (PIU), SMPS, Battery Banks, Electrical substations,  Maintenance Tunnel Sensors viz. Air Velocity Sensors, CO-OP Sensors, Water Pressure Sensors, and Temperature Sensors.  Managing Operation and Maintenance of Advanced traffic Management System (ATMS)  Managing Maintenance of Toll Management System (TMS)  Preventive maintenance of all the networking switches as well as Server and desktops.