Position: Project Manager- Tunnel

Work Area :


Skill:
  • Tunnel Excavation
  • Drilling And Blasting Work
  • Grouting
  • Pipe Roofing
  • NATM
  • NATM excavation techniques
  • Tunnel engineering Supervise NATM excavation parameters
  • NATM design
  • Good Problem Solving Skill
  • Good Communication
  • Communication
  • Industry: Tunnel Construction Project
    Functional area: Tunnel Construction
    Designation : Project Manager- Tunnel
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 21.00 Lacs

    Profile summary:


    I am a graduate civil engineer with more than 25 years of experience in large infrastructure projects. I have a professional experience specialized in Railway Projects, hydroelectric project and transportation. I have worked with clients like Jammu and Kashmir power Development Corporation, Konkan Railway Corporation Limited and National highway authority of India. I have been involved in the execution and supervision of many tunnels of varied lengths which were driven by conventional, New Austrian tunneling methods. I was involved in the construction and supervision of tunnels in adverse geological conditions and with flowing strata.

    Education details :


    B.Tech/B.E.
    Specialization : Civil Engineering
    Institute name: Bangalore University Karnataka
    Marks / Percentage : B
    Passing year: 1998

    Work Experience :


    Project Manager- Tunnel
    2023-04-05 - Presently working
    Company name : LOMBARDI ENGINEERING PVT. LTD
      Annual salary : 19.00 Lacs
    Industry : Tunnel Construction Project
    Functional area : Tunnel Construction

     Supervision of Tunnel No-1(Length-3.209 Kms) by New Austrian Tunneling Method in connection with the USBRL Rail Link Project. Involved in the execution of all tunnel activities which involves Pipe roof, SDA bolt, PU grout , primary support system like shotcrete (fibre), permanent concrete lining and grouting for controlling ground water.  To ensure that the work is being carried out in accordance with the specification, approved method statements and approved construction drawings.