Job seeker profile

Mr. DHARMENDRA SINGH RAWAT


Sr. Tunnel Engineer
8.8


Personal information:


Name : Mr. DHARMENDRA SINGH RAWAT
Birth Date : 1991-07-02
Country : India
Position: Sr. Tunnel Engineer

Work Area :


Skill:
  • Tunnel Excavation
  • Drilling And Blasting Work
  • Grouting
  • Pipe Roofing
  • NATM
  • NATM excavation techniques
  • Tunnel engineering Supervise NATM excavation parameters
  • NATM design
  • Good Problem Solving Skill
  • Good Communication
  • Industry: Tunnel Construction Project
    Functional area: Tunnel Construction
    Designation : Sr. Tunnel Engineer
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 7.70 Lacs

    Profile summary:


    To pursue career with an esteemed organization having a global vision that could provide me with an opportunity to implement the knowledge acquired and my talent in the relevant field.

    Education details :


    B.Tech/B.E.
    Specialization : Civil Engineering
    Institute name: UTTARAKHAND TECHNICAL UNIVERSITY
    Marks / Percentage : B
    Passing year: 2015

    Work Experience :


    Sr. Tunnel Engineer
    2021-12-01 - Presently working
    Company name : Larsen & Toubro (L&T)
      Annual salary : 7.00 Lacs
    Industry : Tunnel Construction Project
    Functional area : Tunnel Construction

    · Ensure Project Excavation Six stage sequence is carried out accordance with approved ensuring adherence to Project schedule and also involve in all Execution activities. · Execution of different type of support systems Like: - cavity treatment, Pipe-roof, Rock bolt, Shotcrete, Grouting, Fore poling, lattice girder, invert struts, Probe hole, & wire mesh to the face of stability. · Working with NATM method. · Working out different DRILLING & BLASTING patterns to split the rocks so to get maximum pull. · Inspection of Rock Bolt installation & its testing (Pull out test ), slump test, flow test, core cutting, · Execution as per consultant drawings & specification · Worked very closely to improve the cycle time during excavation period. · Blast Monitoring to minimize the over break and optimize the Blast with less specific Charge and Powder Factor.