Job seeker profile

Mr. Aniket Kumar Srivastava


Tunnel Engineer
18.18


Personal information:


Name : Mr. Aniket Kumar Srivastava
Birth Date : 1985-07-14
Country : India
Position: Tunnel Engineer

Work Area :


Skill:
  • Tunnel Excavation
  • Drilling And Blasting Work
  • Grouting
  • Pipe Roofing
  • NATM
  • NATM excavation techniques
  • Tunnel engineering Supervise NATM excavation parameters
  • NATM design
  • Good Problem Solving Skill
  • Good Communication
  • Industry: Tunnel Construction Project
    Functional area: Tunnel Construction
    Designation : Tunnel Engineer
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 16.50 Lacs

    Profile summary:


    Aiming to seek full time profession where my knowledge and skills are utilized and enriched for best growth of the organization which will indirectly help in constant upgrading of my career..

    Education details :


    Diploma
    Specialization : Matrix Institute of Business Management
    Institute name: Matrix Institute of Business Management
    Marks / Percentage : B
    Passing year: 2016

    Work Experience :


    Tunnel Engineer
    2020-07-15 - Presently working
    Company name : ROBBINS TUNNELING & TRENCHLESS TECHNOLOGY (I) PVT. LTD
      Annual salary : 16.00 Lacs
    Industry : Tunnel Construction Project
    Functional area : Tunnel Construction

    • Construction of Twin Tunnel using Earth Pressure Balance TBM.HK (Diameter 6.58M) and THI (Diameter-6.55M) • Having good knowledge of launching TBM, Key allocation, Initial drive and cutter head intervention on TBM. • Experience in tunneling, Ring Building, Key selection, also have experience in pipe line, hyperbaric line, primary grouting, cutter head intervention for TBM • Experience in TBM Breakthrough Water leakage arrestment. • Experience in conducting Soil Investigation along Tunnel alignment. • Well versed in arresting water leakage in D ‘wall joints and confinement wall leakage on tunnels. • Having experience in Sink Hole Rectification, Soil Strengthening, Grout column plan & Execution • Pailing, Diphragram wall, Gide wall, French column • Have experience in NATM.