Job seeker profile

Mr. ANKIT THAKUR


Tunnel Engineer
6.6


Personal information:


Name : Mr. ANKIT THAKUR
Birth Date : 1997-12-06
Country : India
Position: Tunnel Engineer

Work Area :


Skill:
  • Tunnel Excavation
  • Drilling And Blasting Work
  • Grouting
  • Pipe Roofing
  • NATM
  • NATM excavation techniques
  • Tunnel engineering Supervise NATM excavation parameters
  • NATM design
  • Good Problem Solving Skill
  • Good Communication
  • Industry: Tunnel Construction Project
    Functional area: Tunnel Construction
    Designation : Tunnel Engineer
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 5.50 Lacs

    Profile summary:


    Civil Engineer having 5 plus years of experience in Railway Tunnel Projects (NATM) Drilling and blasting in different parts of India and as an employee willing to work in an organization where I can prove my skills and creativity to improve the outputand standards within tight deadlines in INDIA & Abroad..

    Education details :


    Diploma
    Specialization : Civil Engineering
    Institute name: Rajiv Gandhi Government Polytechnic Kandha,
    Marks / Percentage : 60%
    Passing year: 2017

    Work Experience :


    Tunnel Engineer
    2022-11-15 - Presently working
    Company name : DILIP BUILDCON LIMITED AND HINDUSTAN CONSCTRUCTION COMPANY LIMITED (JV)
      Annual salary : 5.00 Lacs
    Industry : Tunnel Construction Project
    Functional area : Tunnel Construction

    Supervision & controlling of day-to-day activities of Tunnel excavation & slope stabilization is performing as per GFC & standards of CA and preparing documents for the same [ATSS, Pour Cards, checklists for various activities (like rock bolts, wire-mesh, lattice girder, shotcrete & pipe roof etc.), Cycle time reports, Shift report, delay reports. 2. To check and ensure the contact grouting works in Tunnel. 3. To check & ensure for reinforcement, formwork as per GFC & quality of concrete before starting any pouring. 4. Supervision of all works whether it is performing within the HSE norms. 4. To prepare comparison between planned time and actual time and give suitable solutions to contractor to overcome such delays to achieve the deadline for the completion of project. 5. Supervision of all works whether it is performing within the HSE norms