Job seeker profile

Mr. HIRDESH TYAGI


Project Manager - Construction
25.25


Personal information:


Name : Mr. HIRDESH TYAGI
Birth Date : 1984-06-18
Country : India
Position: Project Manager - Construction

Work Area :


Skill:
  • Project Management
  • Project Planning
  • Project Execution
  • Team Management
  • Project scheduling
  • sound Knowledge of Highway Execution Planning
  • AutoCad
  • Team Building skill
  • Good Problem solving Skill
  • Industry: Construction/Engineering/Cement/Metals
    Functional area: Highway / Structure
    Designation : Project Manager - Construction
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 29.00 Lacs

    Profile summary:


    Not Available.

    Education details :


    B.Tech/B.E.
    Specialization : Civil Engineering
    Institute name: JRN University
    Marks / Percentage : B
    Passing year: 2010

    Work Experience :


    Project Manager - Construction
    2012-06-26 - Presently working
    Company name : Brij Gopal construction co. pvt. ltd
      Annual salary : 26.00 Lacs
    Industry : Construction/Engineering/Cement/Metals
    Functional area : Highway / Structure

    • Construction of KOTA MUSTAKIL, RAIPUR and MADHEPURA group of villages water supply scheme(Surface Water) and Electric/Solar based Piped Ground water Supply Schemes (270 Nos.) in villages of blocks, district-Jalaun with relevant works including commissioning and Operation & Maintenances for 10 Years. • Infrastructure Development, Footwear Park, Sector 5 & 77, 561- acre area (MET Project) Jhajjar Haryana. • Construction of out the drain master SWD Leg No. I & No. Il with RCC box drain from Rly. Culvert No. 47 & Rly. Culvert No. 50 up to Nazafgarh drain and providing external storm water drainage of Sector 37C, 37D & Sector 99 to 115 Gurgaon.” Construction of various sizes RCC box drain with ready mix concrete M 25 grade including centering and shuttering providing and fixing of water stopper 250mm wide 8mm to 11mm thickness with central bulb & bituminous board, providing and fixing SFRC manhole heavy duty cover and all other works contingent thereto”.(including 3 year maintenance/defect liability period free of cost) A/C Rs 264.90 Crores Div-1 & Div-4.