Job seeker profile

Mr. Sahil Sachdeva


Material Engineer
10.10


Personal information:


Name : Mr. Sahil Sachdeva
Birth Date : 1991-04-27
Country : India
Position: Material Engineer

Work Area :


Skill:
  • Project Management
  • Project Planning
  • Project Execution
  • Team Management
  • Project scheduling
  • sound Knowledge of Highway Execution Planning
  • AutoCad
  • Team Building skill
  • Good Problem solving Skill
  • Industry: Construction/Engineering/Cement/Metals
    Functional area: QA/QC
    Designation : Material Engineer
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 6.00Lacs

    Profile summary:


    Result oriented professional with over 11 years of experience in Supply chain management, techno‐commercial evaluations & Construction Project Operations & Coordination.  Recognized for integration, continuous improvement, better collaboration and improved visibility across end-to-end supply chain.  Monitored and tracked supplier performance to enforce adherence to quality standards and established timelines.  Skilled in enhancing supplier operational performance and improving lead times through effective integration of price, quality, inventory positioning & operational considerations.  Streamlined working SOPs for enhanced operational effectiveness; acted as an escalation gate to resolve issues of procurement & purchase functions.  Hands-on experience & sensitization to the day-to day challenges at all levels of project operations; honed skills in anticipating and visualizing scenarios beforehand..

    Education details :


    B.Tech/B.E.
    Specialization : Electrical Engineering
    Institute name: M.M Engineering College, Haryana
    Marks / Percentage : B
    Passing year: 2012

    Work Experience :


    Material Engineer
    2021-11-15 - Presently working
    Company name : Gurugram UG Cabling
      Annual salary : 6.00Lacs
    Industry : Construction/Engineering/Cement/Metals
    Functional area : QA/QC

    Supplied material of 181 Cr during FY 2022-23.  Obtaining inspection reports & dispatch instructions to vendors after getting and analyzing the requirement of site. Preparation of reports like invoicing status, JSR, PSV & Material reconciliation, also compilation of the same for various internal & client meetings.  Monitored project progress, identified risks and took corrective action as needed.  Developed and implemented project plans and budgets to ensure successful execution.  Executing Work Volume of 103 Cr, Which Involves Conversion of Overhead Electrical System into Underground System by laying of 11 KV Underground Cables, LT Cables, Optical Fiber, Ring Main Units, Distribution Transformers and LT Panels Under Gurugram Smart City Project.  Proposed Looping between 11 KV Feeders by doing Load Flow Analysis using ETAP to ensure 24X7 Reliable Supply to Consumers  Heading Execution and Testing & Commissioning Team of 15 Engineers and 12 Supervisor with working strength of 387 Manpower.