Profile summary:
PMPR PMIR Certified Professional along with over 22 years of experience in project management, Supervision, and execution of large and prestigious construction projects of Oil and ONGC, IWAI, Port etc. Remarkable ability to communicate effectively and Decent managerial skills for handling large groups of people.Preparation of Engineering documents like Technical Bids, Specifications, Design Basis, Data- sheets and Calculations.
• Project Planning & Man Management, preparing schedule for execution, billing resource planning, Monitoring, internal & external documentation, commissioning & hand over of project. ISO Auditing & Safety Auditing, Quality and Inspection Proficient in civil works construction of heavy foundation, structural work, pavement work, power transmission line etc..
Work Experience :
Engnr-Other
2022-09-19 - Presently working
To review the ongoing site works as per approved QA/QC plan and technical
specification.
• To check test report of the materials used for construction, quality control measures,
Safety measures adopted at the time of construction in the field as per SOP.
• Witness, provide advice and assistance on start-up, testing and commissioning and safety
aspects as per scope of work. Review Test report of the materials used for construction.
• Approve the quality inspection of work as per SOP through PC and FE and make
necessary site visits as and when required for inspection.
• Certifying the quality of work at least 20% of the physical and financial progress of
executed works in the respected formats which executed by contractor through PC and
FE.
• Check and approved the quality control of Contractor’s executed works through TPIA
Team and approve Joint Site Inspection Report documents before official submission to
the PHED Division Office by TPIA team.
• Submit the site inspection report and assist TL/CME in preparing fortnightly inspection
report and other quality control reports.
• Highlight all the quality related issue of construction to PHED Officials through TL at
CME level or through PC at EE level for better performance of scheme without delay.