Successfully erection of 33Kv & 11kv GIS Panels.Understanding Technical drawings, SLD, BOQ.Having knowledge about Substation Wiring work & Planning of materials required for wiring.Erection of 33Kv & 11kv RMU (7 Way, 5 Way, 3 Way).Designing drawing circuit Diagram for wiring.Having knowledge about 33/11Kv Substation Electrical work.Erection of 11/0.433Kv Compact Secondary Substation (CSS).Having knowledge about HT & LT Cable laying work, Cable Route Planning.Having knowledge about erection & installation of Street Light Pole, Street light Power cable laying & termination work, Installation of high mast, Fixing of light fixture.Designing drawing of RMU Foundation, Platform & Earth Layout.Having knowledge about designing drawing of Substation and Cable Trench Route, Transformer Foundation / Support, etc.Erection of 10 MVA Power Transformer & 315 KVA LT TransformerCoordinating with Client / Consultants for any site instructions and inspection of works..