Profile summary:
Roles & Responsibility: CHP Operation and Maintenance
Coal supply to bunke without any interruption as per load schedule.
Total responsible for issuance of PTW for Preventive maintenance & Corrective maintenance work through by maintaining proper LOTO system.
Responsibleforeffectiveapplicationof5stechniquesforbetterhousekeeping.
Maintain as per company work order
Achieve maximum Plant Load Factor with proper coal blending.
Unloading of Coal Rake through Wagon Tippler within free time (i.e. 5 h).
Study of equipment failures rates in Coal Handling Plant – Analysis of critical failures
Effective management of Coal yard by implementing the procedure of FIFO.
Monitoring the CHP Utilization Factor.
Achieve Optimum GCV of feeding coal with proper mixing of Indian and Imported Coal.
Coordination with the external agencies to conduct the Physical verification of the Coal.
Implementation of Permit to Work system, Complete PM schedule and uploading of check lists in IFS, and Defect monitori.
Work Experience :
Civil Engineer
2020-09-09 - Presently working