Job seeker profile

Mr. R.Arikrishnan


Surveyor
9.9


Personal information:


Name : Mr. R.Arikrishnan
Birth Date : 1997-09-05
Country : India
Position: Surveyor

Work Area :


Skill:
  • Tunnel Excavation
  • Drilling And Blasting Work
  • Grouting
  • Pipe Roofing
  • NATM
  • NATM excavation techniques
  • Tunnel engineering Supervise NATM excavation parameters
  • NATM design
  • Good Problem Solving Skill
  • Good Communication
  • Industry: Tunnel Construction Project
    Functional area: Survey / Design / Engineering
    Designation : Surveyor
    Desire job type : Permanent
    Employment type : Full Time
    Preferred shift : Day
    Expected salary: 9.10 Lacs

    Profile summary:


    Experienced (Road,Canal,Railway,Tunnel,Building) survey fully knowledgeable in the ways to ascertain the spaces. This includes measurement of land, constructions, underground land space, movable and Immovable objects that can be used in engineering making maps construction mining land evaluations and other projects..

    Education details :


    Diploma
    Specialization : Civil Engineering
    Institute name: M.S.P.V.L. Polytechnic College
    Marks / Percentage : B
    Passing year: 2015

    Work Experience :


    Surveyor
    2022-05-17 - Presently working
    Company name : Larsen & Toubro Ltd
      Annual salary : 8.00 Lacs
    Industry : Tunnel Construction Project
    Functional area : Survey / Design / Engineering

    • TBM regarding Manual survey, Wriggle survey, Laser shifting, Report making and sumpit clint, Alignment Checking, • During point shifting time we will do traversing and level travers also to be done • Cradle marking, Runway Layout, Gantry Beam marking, and proposed drawing making and taking approve as per site requirement • NATM Process Approach Road marking for Tunnel opening face modification to work progress and material sources. Profile marking Tunnel face, roof bolting and RIB fixing layout, chainage marking, Drilling and blasting method, Elevated Station on the pillar • Preparing Monthly Alignment and cross- section Progress Reports, Inspection Report and other reports preparation required as per time to time. • Check levels and day to day measurement and keep all measurements records. • Check and prepare the Dwg. As per the project requirements