2+ years of experience in road estimator & basic knowledge of auto cad
I am fully aware of Latest Techniques and software used in my field of expertise.
Good Knowledge in M/S office also..
Work Experience :
Surveyor
2022-11-23 - Presently working
“Improvement and Widening to two lane with paved shoulder of road from
existing Km 438.170 (Khowai Chowmuhani) to existing Km 439.410 (South
Pulinpur) of NH-08 and from design Km 0.000 (South Pulinpur) to design Km
36.00 (near Rangamati) of NH 208 on Khowai – Teliamura- Harina section (Total
length 37.24) (Package-II) in the state of Tripura on EPC mode under JICA ODA
Loan Phase-6”
RFP for the work “Improvement and Widening to two lane with paved shoulder of
road from design Km 36.000 (Rangamati) to design Km 72.000 (Pati Chhari) (Total
length 36.000 Km) on Teliamura to Harina section of NH 208 (Package –III) in the
state of Tripura on EPC mode under JICA ODA Loan Phase-6”
The site of the Four Lane with Paved Shoulder Project Highway comprises the
section of NH-119 from Behsuma to Bijnor in the state of Uttar Pradesh. The
project road starts at Existing Chainage km 39+240 on NH 119 near Behsuma
and ends at Existing Chainage km. 86+590 near Bijnor of NH-119, in the state of
Uttar Pradesh. The land, carriageway and structures comprising the Site are
described below.
“Construction of Imphal Ring Road - Package 2: Km 17.900 to Km 25.980, Km 32.125
to Km 43.100, and Spur to RIMS (Length: 19.87 km)”
“Construction of Imphal Ring Road - Package 3: Km 43.100 to Km 54.155 and
Spur to FCI (Length: 12.135km)”