Surveyor
2016-09-18 - Presently working
• Take responsibility for transfer Horizontal and Vertical controls for tunnel, station and throughout alignment.
• Topographical survey and facilities studies, Alignment inspections, Detailing for the Project.
• Site setup, various site layout job, data record and drawing prepare & provide to design as require.
• Casting yard setup, Segment casting shed, mould fixing, Rail line, batching Plant, boiler & chilling plant layout, trail ring assemble and dimension check for final production, ground level fix as per drainage etc.
• TBM launching Shaft setup , Pile layout , rail line , muck pit , site office and utilities , drainage , pile cap, ring beam etc .
• Secant Pile layout, casing checking, pile vertical, cut-off level, toe level verify.
• Design tunnel axis verify throughout alignment for any infringement, like high rise building, low level basement , bore well , bore holes, old building etc for TBM safe drive.
• Instrumentation work for ground settlement, Building settlement.
• Verify Shop drawings from Design before setting out activity.
• All survey related works
Surveyor
2016-09-18 - Presently working
• Take responsibility for transfer Horizontal and Vertical controls for tunnel, station and throughout alignment.
• Topographical survey and facilities studies, Alignment inspections, Detailing for the Project.
• Site setup, various site layout job, data record and drawing prepare & provide to design as require.
• Casting yard setup, Segment casting shed, mould fixing, Rail line, batching Plant, boiler & chilling plant layout, trail ring assemble and dimension check for final production, ground level fix as per drainage etc.
• TBM launching Shaft setup , Pile layout , rail line , muck pit , site office and utilities , drainage , pile cap, ring beam etc .
• Secant Pile layout, casing checking, pile vertical, cut-off level, toe level verify.
• Design tunnel axis verify throughout alignment for any infringement, like high rise building, low level basement , bore well , bore holes, old building etc for TBM safe drive.
• Instrumentation work for ground settlement, Building settlement.
• Verify Shop drawings from Design before setting out activity.
• All survey related works